Aerospace NDT: U.S. Supplier and Inspection Planning

Start with the part configuration and the authorized inspection task. Confirm the controlling technical data, personnel evidence, application capability and record requirements before selecting a supplier. Inspection findings support defined decisions; they do not automatically authorize repair or return to service.

For: U.S. inspection buyers, engineers, quality teams and technical reviewers

Identify the aircraft task and its technical authority

Aerospace inspection procurement starts with the part and the authorized task. A new manufactured component, an installed structure, a repair inspection and a development specimen can share a material while having different requirements. Record the part identity, configuration, life-cycle stage and purpose of the examination before discussing instruments or contractor availability. The relevant engineering and quality authorities should define what the inspection is intended to establish.

Separate an NDT finding from the wider decision about acceptance, repair or return to service. An inspector may record and evaluate an indication under a defined procedure, while another authorized role makes a release decision. The work package should explain that division instead of allowing a report heading such as “passed” to imply authority the inspection provider was never assigned.

NDT Connect offers resources and a directory for finding potential providers; it does not approve aircraft maintenance or qualify a supplier for an aerospace program. This guide helps U.S. buyers prepare questions and evidence. It should be used alongside the actual customer documents, approved or otherwise applicable technical data and the organization's controlled processes, rather than as an examination instruction.

Preserve the hierarchy of technical documents

Ask which drawing, maintenance task, process specification or engineering instruction governs the work and how its revision is controlled. Identify any customer flow-down requirements and the process for resolving a conflict between documents. An old quotation that names a familiar standard is not a substitute for the current task package, particularly when a repair or part modification changes the examination area.

FAA AC 43.13-1B has a stated scope and conditions for its use; it is not a blanket replacement for manufacturer instructions. The buyer should have the appropriate authority determine the applicable data. A supplier's reference to a public handbook should therefore lead to a document review, not an assumption that all aircraft tasks can use the same generic procedure.

Maintain a brief document register that accompanies the purchase order and inspection record. Include the task identifier, revision, affected part configuration and any approved deviations. If a new instruction arrives while parts are already in process, identify which parts and records are affected before changing the workflow. This prevents a later reviewer from having to infer which requirement was used from the report's issue date.

Frame the inspection objective for metallic components

For metallic parts, identify the feature and the concern the examination must address. A surface-connected indication at a machined feature, a subsurface discontinuity in a casting and a concern at an installed fastener location are different inspection problems. Have the technical owner provide the relevant material, geometry, surface condition and access information so the proposed technique can be assessed against the actual task.

Discuss any surface preparation or disassembly with the responsible organization before requesting inspection. Cleaning, coatings, residual material and restricted access can affect what can be examined and how results are interpreted. The contractor should state preparation assumptions and report limitations explicitly. It should not independently remove protective finishes or alter a component simply because that would make a preferred technique easier to perform.

Use the method name as the beginning of the conversation. Ask why the proposed application of penetrant, magnetic particle, eddy current, ultrasonic or radiographic examination addresses the specified concern and what it cannot establish. A buyer does not need to prescribe instrument settings to ask these questions. The response should point to the applicable procedure and evidence for the configuration, not only to the supplier's equipment list.

Aerospace scope depends on the actual product and decision

ApplicationEvidence to supplyQuestion for the supplier
Maintenance task on an identified componentApplicable maintenance data, configuration and accessDoes the proposed examination meet this specific task?
Production metallic partDrawing, material, process stage and requirementsHow will identity and required coverage be preserved?
Composite or bonded structureConstruction details, suspected damage and repair historyWhat limits arise from geometry, access and construction?
Capability demonstrationRepresentative features and agreed evaluation planWhich production conditions does the demonstration represent?

Treat composite and bonded structures as a different problem

A composite laminate, a honeycomb sandwich and an adhesive bond line require different descriptions from a metal plate. Ask for the relevant layup or construction information, accessible surfaces, local geometry and the condition being investigated. A generic label such as “carbon fiber part” may omit details that determine whether a proposed examination can produce meaningful information at the required location.

NASA's research on composite sandwich inspection discusses NDE approaches for these structures, including thermographic inspection. It illustrates application-specific evaluation rather than a universal ranking of methods. For procurement, ask the supplier to explain its technique's basis on the actual construction and to distinguish a demonstrated capability from a feature described only in a product presentation.

Require the plan to describe how the location and extent of any reported response will be communicated. A colored image without a reliable relationship to the part can be difficult to use in an engineering disposition. Include geometry transitions, inaccessible regions and reference information in the review. Our composite method-selection feature provides additional questions without authorizing any maintenance task.

Review aerospace personnel evidence in its employer context

Request qualification and authorization evidence for the method, technique and role involved, rather than asking only for “Level II certificates.” Identify who performs the examination, who interprets the results, who provides technical oversight and who issues the employer's authorization. The evidence package should let the customer's reviewer determine whether those responsibilities are supported for the proposed work.

FAA AC 65-31B provides guidance on NDI personnel training, experience, qualification, examinations and certification. AIA's NAS410 revision announcement identifies the aerospace personnel standard and its development. Neither a general course certificate nor a publication link proves an individual is currently authorized by the employer for your task.

Ask the supplier to identify the applicable program and edition rather than importing requirements from an unrelated qualification route. Where customer approval or other supplier recognition is required, verify the specific scope through the appropriate source. The qualification evidence planner can organize the request, but it does not award eligibility, confirm a personnel certificate or replace the responsible employer's review.

Define the capability demonstration before the trial

When a task requires a capability demonstration, specify who designs it, which specimens or reference features are relevant, and what evidence the reviewer needs. A convenient sample may show that a system produces an image without representing the material, geometry or target condition of the intended work. Preserve the distinction between training demonstrations, equipment acceptance and an application-specific qualification activity.

NASA-STD-5009C addresses NDE requirements in a defined fracture-control and quantitative detection-demonstration context. It should not be generalized into a requirement for every civil aerospace inspection. Its scope reinforces the need to identify which program requirements apply before borrowing a reliability claim from another component population or demonstration.

Document the examined configuration, procedure, personnel and review method during the trial. If the proposed production workflow changes, identify which part of the demonstration remains relevant and which needs further review. Do not infer a detection probability from a handful of successful observations or convert a supplier's general accuracy statement into an accepted capability for flight hardware.

Connect materials and process controls with the actual task

For penetrant or other process-based examinations, confirm the specified materials and their compatibility with the applicable procedure and part requirements. The purchasing brief should identify who controls consumable identity, storage and use records. It should also make clear which activities are part of the inspection service and which are performed by the manufacturing or maintenance organization.

ASTM's public E1417 scope identifies a liquid penetrant testing practice. A reference to that practice does not provide this guide with authority to select a penetrant system, set processing parameters or define the part's acceptance criteria. The supplier must work from the actual controlled requirements and retain the evidence needed to show which process was applied.

Discuss how process interruptions and nonconforming conditions are handled before the first part enters the workflow. Identify who can stop work, who determines whether a record remains valid and how affected parts are traced. A clear exception route is especially valuable when an issue is discovered after several similar-looking parts have been processed and their physical identity must still be reconciled with individual records.

Keep part identity intact through every handoff

Agree the identification system at receipt: part number, serial or lot information, configuration and the customer's task reference as applicable. Record discrepancies before examination and avoid creating an unofficial substitute identifier that cannot be reconciled later. A correct technical result attached to the wrong part is not a usable inspection deliverable.

For batches, define how the supplier will distinguish examined, awaiting-review and held parts. If the workflow uses temporary labels or fixtures, ask how the identity persists after those items are removed. For installed structures, agree how location references relate to the aircraft or assembly documentation. Photographs can assist orientation, but they should support a controlled reference rather than become the only means of locating the examination.

At subcontractor handoffs, reconcile the physical quantity and the record quantity. Explain how split lots, partial returns and re-examination are documented. A simple status table should show which parts have complete records and which remain unresolved. The table supports coordination; the applicable quality system still determines who can release a part and what evidence that decision requires.

Specify the data and review package before procurement

List the report fields and supporting files the customer expects to receive. Include the part identity, task and procedure references, examination extent, limitations and responsible personnel. Where original acquisition data are required, define the file formats and a representative receiving test. A PDF report, image export and native dataset are different deliverables, even when they describe the same examination.

Ask the reviewer to identify the information needed to understand a reported indication without recreating the inspection from memory. Preserve relevant orientation, location and reference context. If the workflow includes automated processing or AI assistance, identify that function and the human review responsibility. A software label should not conceal which steps produced the final interpretation.

Agree correction and reissue handling. The customer needs to know which report is current and how a changed finding relates to the previous issue. Avoid overwriting an issued record without the required controls. The native-data handover guide and free worksheets can help prepare the administrative package while the technical authority defines its actual content.

Worked scenario: a mixed-configuration component lot

Imagine a hypothetical U.S. supplier preparing an NDT subcontract for a lot of machined aerospace components. This is an editorial example, not a reported customer project. The purchase order names one inspection task, but the receiving team identifies two part configurations and an incomplete revision reference. The supplier pauses scope confirmation and requests the customer's controlling information before scheduling the examination.

The customer's reviewer confirms that the configurations require different task references. The inspection provider updates its work list so each part is associated with the correct requirement. During the agreed trial, a fixture restricts access to one feature. The provider records that limitation and requests the authorized disposition rather than substituting another technique based on an informal conversation.

The final package separates completed examinations from the held feature and reconciles each part to its record. Purchasing can now compare the performed work with the approved scope, while the customer's technical and quality functions make their respective decisions. The value comes from preserving identity and decision authority, not from claiming that the NDT contractor independently approved every part for service.

Compare quotations without trading away the examination

Ask each proposed provider to respond to the same scope, including documentation review, preparation responsibilities, examination extent, technical review and record delivery. Identify customer hold points or witness requirements when applicable. A low quote may exclude activities that another supplier included; make those differences visible before treating the totals as comparable.

Discuss actual dates, logistics and dependencies without assuming a guaranteed turnaround. The provider may need approved technical data, representative samples or customer authorization before work can proceed. Record how changes and re-examination will be quoted. Use the inspection quote planner to compare actual entered amounts after the scope is understood, not to invent a market price for an aerospace approval.

For a supplier search, U.S. regional guides such as Wichita and San Antonio provide planning context. They do not establish that a listed business has the necessary aerospace approval or availability. Obtain current evidence directly and use the aerospace supplier-buying guide to organize the commercial and technical review.

Close the package with clear unresolved actions

Before accepting the inspection deliverables, reconcile the part or location list with reports, supporting files and scope exceptions. Check that the document revisions and identities agree across the package. Refer technical discrepancies to the authorized reviewer and administrative omissions to the person responsible for correcting the record. The buyer should not silently reinterpret a finding to make a delivery checklist appear complete.

Keep unresolved actions visible after the physical parts leave the inspection area. A missing file, an unanswered limitation or an unapproved revision can remain relevant to the customer's release process. Assign a responsible person and retain the communication trail. If a later correction changes the interpretation, use the agreed notification and reissue process rather than assuming an updated file will be noticed.

A useful aerospace NDT procurement record explains why the provider and configuration were selected, what was examined and where the result's limits lie. It also preserves who made each subsequent decision. This gives future reviewers a defensible starting point without turning the directory, quotation comparison or editorial guide into an approval authority.

  • Confirm part identity, configuration and life-cycle stage.
  • Obtain the controlling task and applicable revisions.
  • Define personnel, procedure and capability evidence.
  • Agree preparation, access and exception handling.
  • Specify original data, report fields and review responsibilities.
  • Reconcile parts, records and unresolved limitations at closeout.

Frequently Asked Questions

Can an ordinary Level II certificate establish aerospace task authorization?

The customer and responsible employer must assess the applicable qualification program, method, scope and authorization. A level label or training certificate alone does not answer every task requirement.

Can FAA AC 43.13-1B replace manufacturer instructions?

The advisory circular has stated conditions and scope. The appropriate authority must determine the controlling technical data for the actual task; this guide does not authorize substitution.

Are composite parts inspected like metallic parts?

Their construction, damage concerns and technique limitations can differ. Provide the actual laminate, sandwich or bond configuration and have the responsible technical authority determine the examination.

What should an aerospace NDT report package include?

Define the required part identity, controlling documents, procedure, extent, limitations, personnel and supporting files in the contract. The actual customer requirements govern the final package.

Does a listed provider have automatic aerospace approval?

No. Directory presence supports discovery only. Obtain and verify the current supplier, personnel and application evidence required by the customer.

References & Standards Cited

  1. FAA: AC 43.13-1B inspection and repair guidance View source ↗
  2. FAA: AC 65-31B NDI personnel guidance View source ↗
  3. AIA: NAS410 revision announcement View source ↗
  4. NASA: NDE requirements for fracture-critical metallic components View source ↗
  5. NASA: NDE for composite sandwich structures View source ↗
  6. ASTM: liquid penetrant testing public scope View source ↗

Related on NDT Connect

Join NDT Connect — free

The free marketplace for the NDT industry — connect inspectors and the companies that need them.

Free to join · Compare provider qualifications and confirm availability directly · Browse providers

By NDT Connect Editorial · Updated

Source-based editorial guidance. Read our editorial policy and disclosures.