Skip to content
NDT Connect Logo

Learn NDT

Practical, step-by-step NDT procedures written by inspectors, plus the salary and cost data studies — the how-to and the how-much in one place.

How-To Procedures

How to Calibrate a UT Flaw Detector (ASME V Article 4)

Step-by-step UT flaw detector calibration per ASME V Article 4 and ASTM E317. Velocity, zero, gain, DAC, and TCG with concrete settings.

Read
How to Interpret Radiographs for Weld Defects (ASME V Art. 2)

Identify porosity, slag, lack of fusion, cracks, undercut, and incomplete penetration on radiographs. Density windows, IQI verification, and acceptance per ASME and API.

Read
How to Select UT Couplant: Glycerin, Gel, Water (ASTM E1316)

Couplant selection by temperature, surface roughness, orientation, and material. Glycerin vs propylene-glycol gel vs water vs grease per ASTM E1316.

Read
How to Build a DAC Curve for UT Weld Inspection (ASME V Art. 4)

Step-by-step DAC curve construction on side-drilled holes in a basic calibration block. Primary reference, scanning sensitivity, and 50%/20% reference lines.

Read
How to Perform an MT Yoke Shot (Wet Fluorescent, ASTM E709)

Step-by-step MT yoke procedure: lift test, AC vs DC, wet vs dry, particle application, indication evaluation per ASTM E709 and ASME V Article 7.

Read
How to Perform PT Development (ASTM E165 / ASME V Art. 6)

Liquid penetrant inspection development step: dwell times, developer types, indication evaluation, and acceptance per ASTM E165 and ASME V Article 6.

Read
How to Perform an Ir-192 Source Changeout (NRC 10 CFR 34)

Step-by-step Ir-192 industrial radiography source changeout procedure: shipping cask handling, transfer, wipe test, leak test, and survey requirements per 10 CFR 34.

Read
How to Perform a Piping Thickness Survey (API 570 / API 574)

Step-by-step UT thickness survey on process piping: TML selection, dual-element probe setup, data recording, corrosion rate calculation, and remaining life per API 570.

Read
How to Set Up a PAUT Scan Plan (ASME V Article 4 Mandatory App. IV)

Build a code-compliant PAUT scan plan: weld geometry import, focal law generation, beam coverage validation, and sensitivity calibration in ESBeamTool or OmniScan.

Read
How to Write an NDT Procedure to ASME Section V (Audit-Ready)

Step-by-step guide to authoring a code-compliant NDT procedure to ASME V. Required elements, demonstration requirements, Level III sign-off, and audit checklist.

Read

concept