Skip to content

Reporting workflows · U.S. inspection teams

Review NDT Report Completeness Before Issuing

Use the application’s field checks as a starting point, then verify the evidence, scope and review decisions that support the specific saved report you intend to issue.

NDT Connect Editorial · Published · Editorial policy

Treat issuing as a deliberate record decision

The Issue action is the point where a saved draft becomes a preserved version in the free NDT reporting library. Prepare for that action by asking what evidence supports the document, which review decisions are complete and which matters remain unresolved. A report can look finished while still containing an incorrect component reference or a conclusion that exceeds the examined area. Conversely, a technically careful draft may be waiting for a missing client name or a final save. These are different problems and need different responses. This guide separates the application's completeness check from the professional review that determines whether the particular report is ready for its intended use.

The NDT Connect reporting workspace lets guests prepare and download draft PDFs. Saving and issuing tracked records requires a verified free account. Issuing preserves the selected saved version; it does not supply an electronic signature, certify an inspection or approve a component for service. Keep any required employer, customer or engineering approval in the project's agreed process. The useful outcome is a reviewed record with an identifiable number, revision and status, supported by evidence that can be retrieved when the recipient asks a question.

Start with the correct draft and scope

Open the intended report and verify its client, project, inspection date and location before editing a checklist. Similar report titles are common during repeated production work. A familiar logo or table arrangement is insufficient to distinguish today's record from an earlier job. Identify the inspected objects using the references needed by the project, such as component numbers, weld identifiers or drawing locations. Compare those references with the source records. Where an object has several identifiers, explain the relationship rather than silently choosing the one that fits most neatly into a table column.

Read the inspection scope beside the conclusion. The scope should explain what work this record covers, while the conclusion should remain within that boundary. If only selected areas were examined, a broad statement about an entire assembly may mislead a later reader. Describe relevant exclusions and unresolved access restrictions in suitable narrative fields. If the evidence is insufficient to decide whether the wording is accurate, leave the report in draft and resolve the question with the responsible person. Filling a text field is not a substitute for establishing the boundary of the inspection.

Understand the application's minimum field check

Before issuing, the current tool checks for company name, client name, inspection date, inspector name, procedure reference, acceptance criteria, inspection scope and conclusion. It also requires at least one table row containing a nonempty cell. These checks identify obvious omissions. They do not understand whether an entered reference is current, whether a result belongs to the named component or whether the conclusion follows from the evidence. A row containing only a placeholder can satisfy a simple presence check while remaining useless as an inspection result. Review its meaning yourself.

Use the missing-field list to find work that needs attention, not as a target to defeat. Do not insert arbitrary text merely to activate a button. If a required item genuinely has a different project meaning, agree how to document that circumstance with the responsible reviewer. Where results are incomplete, an explicit limited-scope or interim reporting arrangement may be appropriate only if the project permits it and its boundaries are clear. The software cannot make that arrangement on your behalf. Its completion list supports document preparation; your organization determines the evidence required for release.

Trace the technical references to their source

Record the actual procedure identifier and revision used for the work, then check that the report's stated method, coverage and technical descriptions agree with it. Review any code or specification references against the authorized project documents. A public publication listing, such as ASME's Section V nondestructive examination page, establishes publication identity, not the governing edition or acceptance decision for your job. Obtain those details through the project's controlled requirements. A generic standard name leaves the reader uncertain about which document supported the evaluation.

Keep the acceptance source identifiable separately from the procedure reference. If several requirements apply to different objects or examination stages, make the association explicit in the report or its referenced evidence. A reviewer should be able to select a result and understand which basis was applied without guessing from a list of unrelated standards. Do not introduce numerical limits from an example, an old template or an AI draft. Where the applicable source is disputed or unavailable, record the unresolved question in the working review and seek clarification before representing the report as complete.

Check the result row as evidence

Select a representative result row and trace it back to the original inspection evidence. Confirm the object identifier, location convention, units, reported value and any interpretation or disposition. Then check the remaining rows for the same relationships. This exercise often finds errors that a visual spell check misses: a copied identifier repeated across several components, a unit omitted from a header, or an observation entered under a conclusion column. Retain the original evidence through the project's normal records process. The report can reference native files, images or logs without claiming to contain those files automatically.

Review empty cells deliberately. A blank may mean that an item was not examined, was not applicable, was unavailable or was simply overlooked. These meanings should not be interchangeable. Choose wording appropriate to the actual condition and explain any legend needed by the recipient. Compare the number of reported objects with the intended scope and explain any difference. A completed-looking table can still omit the last component in a source list. The goal is a traceable account of the work performed, including limitations, rather than a grid with as few visible blanks as possible.

Verify personnel wording and review responsibility

Confirm that the named inspector is the person associated with the reported work and that any qualifications or authorization statements are supported for the relevant method, scope and date. Avoid expanding a brief certificate label into a broader claim. ASNT's explanation of employer-based certification distinguishes employer-issued certification from ASNT-issued certification. That distinction matters when writing a personnel description. The free certificate manager can organize entered record details, but it does not verify the issuer or decide who may perform a particular examination.

Identify who is responsible for the review and what evidence the project requires to demonstrate that review. Entering a reviewer's name in a text field does not obtain their approval. Similarly, the account owner who clicks Issue is not automatically the technical authority for every method represented in a document. If the work requires a separate authorization, obtain and retain it through the agreed channel. Use the qualification evidence planner to organize questions when necessary, while keeping the actual decision with the appropriate employer or project representative. Do not manufacture a signature image or imply an approval that has not occurred.

Inspect equipment references and dates in context

Compare the report's equipment identification with the instruments actually used, including serial numbers and relevant accessories where the procedure requires them. Check the calibration references and any required examination checks against the inspection dates. A record that is current today does not automatically establish the condition of an instrument during earlier work. Likewise, a later calibration entry should not silently replace the evidence relevant to the original examination. Resolve discrepancies with the equipment owner and technical reviewer before summarizing them as acceptable in a report.

The equipment tracker and calibration reminder are useful for organizing this follow-up, but their entries do not synchronize into the report automatically. Copy relevant information deliberately and check it against the source evidence. A reminder being sent is not proof that a calibration or field check was completed. Distinguish the equipment's identity, the reference document and the professional decision about suitability. If an unresolved equipment issue affects reported results, retain the question in the review process and determine its impact. Do not assume that adding a certificate number alone closes the matter.

Proof the rendered PDF before preserving the version

Download a draft PDF and read it as the recipient will. Check long table headings, repeated units, page breaks, special characters and the visibility of conclusion text. Inspect both company and client logos where used, including whether they identify the right organizations and remain legible. A logo is a visual identifier, not an approval mark supplied by the tool. Follow the project's permission and branding arrangements. The report should remain understandable even if a reader prints it in grayscale or views a single page separately from the rest of the document.

Compare the PDF with the workspace after every material correction. If you discover a table error during proofing and fix it, the previously downloaded PDF still contains the old content. Download a fresh proof and identify which artifact was actually reviewed. Browser-added filename suffixes do not establish revision order. Keep draft proofs distinguishable from the output ultimately issued. Where a table is too wide to read comfortably, restructure it into understandable sections while preserving the relationships between object identifiers and results; do not sacrifice those relationships merely to make a page appear tidy.

Save the exact content that was reviewed

The issue control acts on the saved report version, so save the intended draft after completing changes. Check the response and confirm that the workspace no longer indicates unsaved edits. The review acknowledgement should describe work you actually performed. Changes to the draft reset that acknowledgement because the content requiring review has changed. This helps prevent an earlier review decision from being casually applied to a later document. It does not remove the need to compare the final content with the evidence or to satisfy a separate approval process.

If a version conflict occurs, stop and reconcile the available records rather than repeatedly clicking Issue. Another open session may have saved a different version, or the record may already have changed status. Preserve any local work you still need before opening a replacement. Confirm which saved content is intended for release and repeat the relevant checks after reconciliation. Once the issue operation succeeds, verify the displayed issued status and report identity. A network delay or an error message should not be interpreted as successful release merely because the button was pressed.

Work through a fictional readiness review

Consider a fictional inspector preparing a UT report for three numbered spool welds. The company, client and procedure fields are complete, and a table contains results for two welds. The third row contains only its identifier. The application sees a nonempty result table, but the reviewer finds that the scope still describes all three welds as examined. The reviewer returns the draft for clarification instead of treating the enabled Issue control as proof of completeness. The source records show that access to the third weld was unavailable, and the project representative must decide how that limitation is to be reported.

In this example, the authorized reporting arrangement is clarified before release. The author revises the scope and result wording to state the work actually completed, identifies the outstanding area and checks that the conclusion makes no claim about it. A draft PDF is reviewed, the changes are saved, and the responsible issue acknowledgement is completed. These are illustrative decisions, not instructions to accept reduced inspection coverage on a real project. The central lesson is that the missing information was a scope problem, even though the software's minimum text-presence checks were satisfied.

Separate a field check from the decision it supports
Review itemApplication can checkAuthor or responsible reviewer must establish
Procedure referenceEntered text is presentCorrect identifier, revision and relevance to the examination
Result tableA row contains a nonempty cellActual results, object identity, units and coverage
Inspector nameEntered text is presentCorrect person and supported role or authorization wording
Review acknowledgementUser deliberately acknowledges reviewRequired review actually occurred and its evidence is retained
Issued statusSaved version is preservedIntended recipient receives the correct reviewed output

Retain a useful readiness record

Use the downloadable worksheet to record the review topic, evidence reference, discrepancy, action owner and closure evidence. Keep this working record in the approved project location rather than pasting unnecessary private details into a public message or support request. A useful entry is specific enough that another reviewer can understand what changed. For example, describe the corrected relationship between the scope and a result row instead of writing only checked. If an item remains open, identify the decision needed and the person responsible for it; an empty status cell gives little help to the next reviewer.

After issuing, export the intended issued PDF and confirm its number, revision and status before delivery. Subsequent content changes require a draft revision through the reporting workflow; the preserved issued version remains a separate record. Communicate any necessary correction through the project's document-control process so recipients know which version to use. Keep the readiness worksheet, source evidence and approval references retrievable for the required project period. This guide supplies a practical review structure, while the actual technical requirements and retention obligations remain those established for the work being reported.

For repeated production reports, avoid carrying a completed readiness worksheet forward unchanged. The layout can be reused, but the evidence references and review findings must describe the new report. A previous reviewer may have resolved a question for a different component, date or procedure revision. Start by identifying which conditions changed, then repeat the checks affected by those changes. Pay particular attention to copied conclusions and imported example rows because they can look polished enough to escape casual review. Remove practice values before release and check that every retained result belongs to this inspection. The checklist is useful only when its answers remain connected to the record being issued.

Report issue readiness and evidence review

Download this editable CSV for the task described above. Replace illustrative prompts with your own supported facts. The worksheet is a planning aid; it does not establish inspection acceptance or approval.

Download the free workflow worksheet

Questions about this workflow

Does the Issue button certify the inspection?

No. It preserves the saved report version after the required fields and user acknowledgement are completed. It does not certify the inspection, validate qualifications or supply a digital signature.

Does a nonempty result row prove the inspection is complete?

No. The application checks that a table contains an entered cell. The author must confirm that the results are genuine, sufficient for the stated scope and supported by the inspection evidence.

Why must I save before issuing?

The issue operation preserves the selected saved version. Save and review the intended draft so the content being issued matches the content you checked.

Can I correct the report after issue?

Create a draft revision through the reporting workflow and follow the project’s correction process. The original issued version remains preserved.

Sources and editorial scope

Primary references support the specific context cited in the guide. Worked examples and suggested workflows are NDT Connect editorial guidance. Confirm the documents and authority applicable to the actual assignment.

More guides: reporting workflows

Free tools for this workflow

Free digital NDT reporting

Import DOCX/XLSX tables, enter specifications and results, add logos and download a PDF. A free verified account saves numbered reports and revisions.

Qualification evidence planner

Organize evidence and questions to confirm with an employer or certification body. The planner does not award a qualification.