Identify what the supplier is actually selling per hour
Two NDT quotations can both display an hourly rate while describing different services. One may price an entire crew for an hour, while another charges each person separately. A third may include equipment in its hourly package or separate it elsewhere. Comparing the visible rate without reading that basis can reverse the apparent price difference. Start by copying the exact billed unit from each written offer into a working comparison. If the offer says only hour, ask the supplier what that unit includes before treating it as a complete commercial description.
Use the inspection quote comparison tool after the billing basis is understood. It can organize entered prices and quantities, but it cannot infer whether a supplier's hour means a crew, a person or a broader service package. Keep the source reference and interpretation in the comparison notes. The objective is to represent the actual offer faithfully, not to force every quotation into the same-looking rate field. A mathematically correct calculation based on the wrong unit is still a misleading buying comparison.
Define the completed scope before normalizing time
Describe the work both suppliers are expected to deliver. Identify the examination scope, access assumptions, component or weld quantities, required documentation and any relevant review responsibilities. Time is one pricing input, not the final product the buyer usually needs. A six-hour crew proposal and a twelve-person-hour proposal may refer to the same staffing duration, but that does not prove they cover the same examination or deliverables. Keep the common scope visible so a difference in staffing description does not hide a difference in what is actually being purchased.
Ask the suppliers to identify any assumptions that affect the time estimate. These may include readiness of the work area, availability of drawings, preparation by another party or the sequence in which items are presented. Do not invent a productivity rate to translate crew size into completed inspection volume. More people do not automatically produce proportionally more valid examination output, and the required roles depend on the task. Use the supplier's actual scope and duration statement, then request clarification if the compared offers describe different completed outcomes.
Record crew composition without treating it as a second multiplier
When a quotation prices a crew, ask what staffing configuration that rate covers and whether it changes under stated conditions. The answer helps the buyer understand the service and identify exclusions. It does not automatically mean the rate should be multiplied by the number of people again. A crew-hour rate normally represents the quoted package for that unit, subject to the supplier's actual wording. Preserve the written definition and calculate from it. If a quote is ambiguous, seek a corrected explanation rather than deciding that the most expensive interpretation must be safer or more complete.
Keep staffing evidence distinct from qualification review. Knowing that a proposal includes two people does not establish their methods, roles, authorization or suitability for the assignment. Review those matters through the appropriate supplier and personnel evidence process. Similarly, a proposed assistant or support role should not be silently treated as equivalent to an independently authorized inspection role. The cost worksheet can record the described crew composition and a review question, while the responsible technical or procurement party evaluates whether the arrangement meets the actual project requirements.
Convert person-based quantities using the quoted participation
For a person-hour basis, establish how many people are billed, which rates apply and how long each is expected to participate. If two people share one rate and both work the same quoted duration, the total person-hour quantity can be calculated from those confirmed inputs. If their rates or participation differ, preserve the separate segments in an external worksheet. Do not multiply every person by the longest attendance period merely because that is simpler. A reviewer should be able to trace the quantity back to the actual offer, including any partial attendance or separate preparation work.
The comparison tool's labor entry is not a full scheduling or payroll system. Use it for a clearly defined rate-and-quantity representation, or record an actual quoted combined amount through the appropriate cost treatment while preserving the detailed basis in the source worksheet. Avoid presenting an invented blended rate as if the supplier offered it. If an external calculation is needed to summarize several confirmed segments, label that calculation and retain its inputs. The goal is a transparent comparable amount, not an attractive hourly figure that hides differences in staffing or participation.
Check how duration is written before entering a decimal quantity. Six hours and thirty minutes is six and a half hours, not 6.30 hours. If the supplier uses billing increments, rounding rules or a defined day length, obtain those terms rather than assuming an eight-hour day or rounding each segment independently. Preserve the original duration alongside the converted quantity so another reviewer can see the arithmetic. A crew-versus-person comparison is already sensitive to its unit; a second error in converting minutes or days can make a correctly identified rate misleading. Ask for a confirmed total when the intended billing calculation remains unclear.
Check which other prices already include the labor
An offer can contain a fixed base price, a labor line and a unit-priced work description without necessarily charging all three in addition to one another. The narrative may describe alternative pricing, included work or an option that applies only after a threshold. Read the commercial relationship before adding the figures. A common error is to enter a fixed inspection package and then add the crew hours that the supplier used to explain that package. If the hours are included, the second amount is not another charge. Ask for explicit confirmation when the wording leaves that relationship uncertain.
Use the tool's separate treatments for added, included, excluded, unknown and not-needed costs to preserve these distinctions. Do not select included merely to make two totals match. Record where the cost is already covered and keep the original quote accessible. When several main price components are entered, confirm that they do not overlap. A subtotal that omits an unresolved charge should remain a known partial subtotal, not a complete project price. Clear cost treatment protects the buyer from both double counting and the opposite problem of assuming that an unexplained item costs nothing.
Keep equipment and mobilization scope visible
Clarify whether the hourly package includes the instrument configuration and accessories needed for the proposed work. A crew price may cover labor and equipment together, or the instrument may be a separate daily or fixed charge. The answer affects the comparison but does not establish the equipment's technical adequacy. Request the actual commercial inclusion and keep any suitability review separate. If the supplier provides one package amount, do not invent an equipment allocation merely to make it resemble another offer's breakdown. Compare understood package scopes and preserve the differing detail levels.
Mobilization and travel need the same care. A quote may charge them once per visit, per person, per crew or through another specified arrangement. Record the actual unit for each rather than copying the labor multiplier across every line. An hourly labor comparison can look correct while travel is doubled or a return visit is omitted. Ask what happens if the crew changes size or the assignment spans another day. Keep uncertain repeated charges open until the supplier explains them, and avoid assuming that a single mobilization amount covers every possible schedule change.
A fictional calculation that reveals double multiplication
Consider two entirely fictional offers for the same defined practice scope, with no claim that these amounts represent market rates. Offer A quotes a two-person crew at 160 dollars per crew-hour for six hours. Its stated labor amount is 960 dollars. Offer B quotes two people at 80 dollars per person-hour, each for six hours, also producing 960 dollars. The visible hourly figures differ, but the defined labor amounts are equal in this limited example. Multiplying Offer A's 160-dollar crew rate by two people again would incorrectly produce 1,920 dollars and misrepresent its written basis.
The equality does not decide which fictional offer should be chosen. The buyer still needs to compare scope, qualifications, equipment, readiness assumptions, reporting and any additional charges. If Offer B's second person attends only part of the day, or Offer A's package excludes reporting time, the inputs and comparison must change. The exercise demonstrates a unit check, not a supplier ranking. Keep the fictional arithmetic separate from real purchasing decisions and use only actual quotations for an operational comparison. The most useful habit is writing the unit beside both the rate and the quantity before multiplying them.
| Offer basis | Calculation | Limited conclusion |
|---|---|---|
| Two-person crew, 160 dollars per crew-hour, six hours | 160 × 6 = 960 dollars | Do not multiply the crew rate by two again |
| Two people, 80 dollars per person-hour, six hours each | 80 × 12 person-hours = 960 dollars | The quantity includes both people’s stated participation |
| Different rates or participation periods | Calculate confirmed segments separately | Do not invent a supplier-offered blended rate |
| Labor described inside a fixed package | Check whether it is already included | Avoid adding an explanatory amount as another charge |
Do not confuse supplier billing with worker pay
A supplier's quoted crew rate is a commercial price for a service. It is not a statement of what individual technicians earn, what time must legally be paid or how payroll deductions are handled. Avoid dividing a crew quote by its headcount and presenting the result as an inspector wage. The price may reflect equipment, administration, travel arrangements, business costs or other included scope. Keep employment and contractor-offer analysis in its own context using the actual written offer to the worker, rather than deriving compensation from the customer's service quotation.
The contract offer comparison is a separate tool for user-entered pay, time, reimbursements and expenses. It does not turn an inspection service quote into a worker's contract or determine legal employment status. Use the appropriate source for each task. A buyer comparing supplier costs needs the supplier's billing basis and deliverables. An inspector considering an engagement needs the terms actually offered to that inspector. Keeping these records separate prevents a precise-looking calculation from answering a different question than the person intended to ask.
Ask how minimums and waiting periods affect the quantity
The stated hourly rate may be subject to a minimum callout, minimum day or another written condition. Ask which unit the minimum applies to and what event starts the billed period. A crew-hour rate with a minimum visit charge cannot always be compared by multiplying only the time the buyer expects the instrument to be operating. Keep the minimum and any included scope in the source worksheet. If the expected work is below the minimum, request the actual quoted amount for that scenario instead of assuming the supplier will bill only the smaller quantity.
Waiting and access delays can also change the commercial quantity. Confirm the quoted treatment for circumstances relevant to the project and how the time will be recorded or agreed. Do not invent a universal standby rule or decide a legal entitlement from a calculator. Use the actual supplier terms to prepare a separate delayed-work scenario if it would materially affect the choice. That keeps the ordinary-case comparison readable while showing the buyer what remains sensitive to site readiness. A lower normal hourly amount may still carry an unresolved cost question when the work cannot begin as planned.
Document the normalization so another buyer can reproduce it
Keep a compact calculation note for each quote: source reference, quoted unit, stated staffing, duration or quantity, inclusion treatment and any external arithmetic used to obtain the entered amount. A second reviewer should be able to reproduce the comparison without asking what you meant by hours. Preserve the supplier's original wording and distinguish it from your interpretation. Where clarification changed the basis, retain the reply and date. This makes later changes easier to handle because the comparison records both the result and the assumptions that generated it.
For federal procurement, FAR 15.404-1 provides an official context for price and cost analysis. Its government requirements are not presented here as universal rules for private NDT buyers. The useful editorial principle in this worksheet is narrower: identify the information being compared and keep its basis transparent. Do not label a simple unit-normalization calculation a formal determination of fair market price. It can reveal an arithmetic or scope mismatch, but a complete purchasing decision also requires the relevant technical, commercial and organizational review.
Recheck the comparison after a change in scope or crew
A revised work quantity, additional reporting requirement or different staffing proposal can alter the original basis. Recalculate from the revised written offer rather than adjusting only the final total. Check whether the same crew unit still applies and whether equipment, minimums or mobilization changed with it. A supplier may confirm the original rate while changing the package it covers, so the rate alone is not enough to carry the comparison forward. Preserve the earlier version where the project record needs it and clearly identify the current source used for the decision.
Before the buyer acts, review the completed comparison with its unresolved questions visible. Confirm that every entered amount has the intended currency, unit and inclusion treatment, and that the compared scope is sufficiently aligned for the decision being made. Export the working comparison deliberately and keep the source quotations. The tool does not award the contract or verify the suppliers' capability. Its value is a clearer decision record: the buyer can explain the crew and person-hour arithmetic, identify what is included, and ask the remaining questions before confusing a headline rate with the cost of the required inspection service.
Crew and person-hour billing basis check
Download this editable CSV for the task described above. Replace illustrative prompts with your own supported facts. The worksheet is a planning aid; it does not establish inspection acceptance or approval.
Download the free workflow worksheetQuestions about this workflow
Should a crew-hour rate be multiplied by the crew headcount?
Not when the written rate already covers the quoted crew. Confirm the supplier’s definition and multiply by the applicable crew-hour quantity rather than counting people twice.
Can I compare two quotes just because their labor totals match?
Matching arithmetic does not establish matching scope. Review deliverables, staffing suitability, equipment, access assumptions and additional charges separately.
What if different people have different hourly rates?
Preserve the confirmed rate and participation segments in an external worksheet. Do not invent a blended supplier rate or conceal the source of an aggregated amount.
Is a supplier crew rate the same as an inspector’s pay rate?
No. A service quotation and a worker’s compensation offer are different records. Use the actual written source appropriate to the decision.
Sources and editorial scope
Primary references support the specific context cited in the guide. Worked examples and suggested workflows are NDT Connect editorial guidance. Confirm the documents and authority applicable to the actual assignment.
More guides: inspection quote comparison
- Price an NDT Return Visit Without Double Counting
A second visit can repeat travel and setup without repeating every original charge. Define why the return is needed and what remains before entering another supplier total.