Skip to content

NDT Inspection Case Studies

Detailed, method-level case studies covering the asset, degradation mechanism, technique selection and findings.

Technical case studies

Real assets, real defects, real method selection — written to method and code depth.

Natural gas transmission and midstream
Gas Pipeline CUI Discovery: Pulsed Eddy Current Survey

A Northeast US gas midstream operator screened 4.2 miles of insulated 24-inch gas pipe with pulsed eddy current, found 38 CUI hot spots, and verified the worst at 71% wall loss using PAUT.

Read case study
Petroleum refining
FCC Reactor H2S Attack: Gulf Coast PAUT Case Study

A Gulf Coast refiner found 6.8 mm wall loss on an FCC reactor shell from high-temperature H2S attack. PAUT corrosion mapping, fitness-for-service, and a $4.2M shutdown avoided.

Read case study
LNG storage and export
LNG Storage Tank Floor MFL: Annular Plate Pitting Case

A US Gulf LNG export terminal ran robotic MFL on a 240-ft full-containment LNG tank inner floor, found 18 pits ≥ 30% wall on the annular ring, and finalized a phased repair scope under API 653.

Read case study
Liquid pipeline transportation (crude oil)
Midwest Crude Pipeline MFL ILI: 312 Anomaly Verification

A US Midwest crude operator ran a high-resolution MFL inline-inspection tool on a 142-mile 20-inch pipeline and found 312 metal-loss features. PAUT and AUT dig verifications, ILI tool tolerance, and PHMSA compliance walkthrough.

Read case study
Offshore oil & gas (subsea production)
North Sea Riser Splash Zone PAUT: 22% Wall Loss Case Study

A North Sea operator caught 22% wall loss in the splash zone of a 14-inch production riser using PAUT and digital RT. Subsea rope-access procedure, defect mapping, and weld-clamp disposition.

Read case study
Nuclear power generation (PWR)
PWR Steam Generator Tube ECT: 14 Tubes Plugged Case Study

A US PWR plant ran multi-frequency eddy current on 12,580 steam generator tubes in a 21-day outage, plugged 14 tubes for ODSCC, and re-baselined the IGSCC monitoring program against EPRI guidelines.

Read case study
Offshore oil & gas (fixed jacket platforms)
GoM Platform Leg PAUT: K-Joint Fatigue Crack Case Study

A Gulf of Mexico platform operator found a 92 mm fatigue crack at a K-node joint in a leg brace using PAUT and ACFM, scoped a class-approved underwater weld repair, and avoided a $34M leg-strengthening project.

Read case study
Petroleum refining (crude distillation)
Crude Tower Girth Weld TOFD: Cracked Repair Weld Found

A West Texas refiner found a 38 mm lack-of-side-fusion in a crude-tower girth weld using TOFD after RT missed it. Method-selection decision, scan plan, repair, and code-compliance walkthrough.

Read case study

Have an inspection scope to publish?