Skip to content
NDT Connect Logo
Home/Cost Guide/Rock Springs/Radiographic Testing
Pricing guide · Tier 3 labour band
Rock Springs, WY

NDT inspection cost in Rock Springs: Radiographic Testing rates

Field-anchored pricing guide for RT (Radiographic Testing) and the other five common NDT methods in Rock Springs, WY. Rates are quoted in USD per hour and reflect the Tier-3 labour band that applies across frontier us markets.

Trona mines and coal-fired power plants both demand MSHA-compliant NDT — a single expired ASNT renewal blocks a contractor from both scopes the same week.

Low band

$360

per hour · routine scope, full-day crew

Typical

$630

per hour · most jobs land here

High band

$1080

per hour · turnaround / night shift / rope access

RT overview

Film or digital RT for new construction and in-service welds per ASME Section V and API 1104.

RT costs include source rental (Ir-192 or Co-60), film/DDA, processing, exclusion-zone setup, and radiation safety officer overhead. Night-shift premiums are common because exclusion zones can't coexist with other site work.

Why Rock Springs sits in the Tier-3 labour band

Rock Springs's industrial substrate — Trona / soda ash mining, Gas processing, Pipelines — pulls NDT scopes onto recurring sites including Genesis Alkali (formerly Tronox) Granger and Sisecam Wyoming trona operations. The local contractor pool prices against MSHA acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.

The Tier-3 multiplier (×0.90 applied to the national RT base band) accounts for local cost of living, procurement competition, and the documentary overhead that MSHA imposes. RT programmes in Rock Springs have historically clustered around the typical rate of $630 per hour, with turnaround and outage premiums pushing toward the high band.

Recurring industries pricing against this band:

Trona / soda ash miningGas processingPipelines

Named operators / sites: Genesis Alkali (formerly Tronox) Granger, Sisecam Wyoming trona operations, Jim Bridger Power Plant (regional).

Factors that move RT costs in Rock Springs

Crew rotation length

Multi-day mobilisations in Rock Springs amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.

Access and rigging

Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Trona / soda ash mining sites in Rock Springs often require all three.

Shift premium

Night shift, weekend, and turnaround windows in Rock Springs typically carry a 25–40% premium on the base hourly rate.

Acceptance criteria

MSHA acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.

Equipment specification

Source licensing, exclusion-zone management, and night-shift premiums are the primary cost levers.

Programme volume

Multi-asset programmes at sites like Genesis Alkali (formerly Tronox) Granger typically negotiate volume discounts of 8–15% off the typical rate.

Mobilisation distance

Remote frontier us sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Rock Springs).

Documentation depth

Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at MSHA sites.

Procurement levers to get the best value
  • 1.Plan RT scopes against the frontier us turnaround calendar to avoid rush premiums.
  • 2.Batch multiple assets at the same site (e.g. Genesis Alkali (formerly Tronox) Granger) to amortise mobilisation across more billable hours.
  • 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
  • 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
  • 5.Where RT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
  • 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
Where RT is applied in Rock Springs
  • Pipeline girth welds per API 1104
  • Pressure vessel welds per ASME Section VIII
  • Casting volumetric inspection
Quick reference

Method

Radiographic Testing

Abbreviation

RT

Labour band

Tier 30.90)

Code authority

MSHA

Get a quote

Post a RT scope and receive parallel quotes from certified Rock Springs providers.

Request a quote

Pricing caveat

The numbers above are field-anchored ranges, not a quote. Actual Rock Springs rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.