Pricing guide · Tier 3 labour band
Cheyenne, WY

NDT inspection cost in Cheyenne: Radiographic Testing rates

Field-anchored pricing guide for RT (Radiographic Testing) and the other five common NDT methods in Cheyenne, WY. Rates are quoted in USD per hour and reflect the Tier-3 labour band that applies across frontier us markets.

Cheyenne sits on the I-25 pipeline corridor — Front-Range pipeline integrity audits demand UT thickness traceability at every river crossing between here and Casper.

Low band

$360

per hour · routine scope, full-day crew

Typical

$630

per hour · most jobs land here

High band

$1080

per hour · turnaround / night shift / rope access

RT overview

Film or digital RT for new construction and in-service welds per ASME Section V and API 1104.

RT costs include source rental (Ir-192 or Co-60), film/DDA, processing, exclusion-zone setup, and radiation safety officer overhead. Night-shift premiums are common because exclusion zones can't coexist with other site work.

Why Cheyenne sits in the Tier-3 labour band

Cheyenne's industrial substrate — Refining, Pipeline corridors, Defense (F.E. Warren AFB) — pulls NDT scopes onto recurring sites including HF Sinclair Cheyenne Refinery and F.E. Warren Air Force Base. The local contractor pool prices against API 510 / 570 / 653 acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.

The Tier-3 multiplier (×0.90 applied to the national RT base band) accounts for local cost of living, procurement competition, and the documentary overhead that API 510 / 570 / 653 imposes. RT programmes in Cheyenne have historically clustered around the typical rate of $630 per hour, with turnaround and outage premiums pushing toward the high band.

Recurring industries pricing against this band:

RefiningPipeline corridorsDefense (F.E. Warren AFB)

Named operators / sites: HF Sinclair Cheyenne Refinery, F.E. Warren Air Force Base.

Factors that move RT costs in Cheyenne

Crew rotation length

Multi-day mobilisations in Cheyenne amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.

Access and rigging

Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Refining sites in Cheyenne often require all three.

Shift premium

Night shift, weekend, and turnaround windows in Cheyenne typically carry a 25–40% premium on the base hourly rate.

Acceptance criteria

API 510 / 570 / 653 acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.

Equipment specification

Source licensing, exclusion-zone management, and night-shift premiums are the primary cost levers.

Programme volume

Multi-asset programmes at sites like HF Sinclair Cheyenne Refinery typically negotiate volume discounts of 8–15% off the typical rate.

Mobilisation distance

Remote frontier us sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Cheyenne).

Documentation depth

Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at API 510 / 570 / 653 sites.

Procurement levers to get the best value
  • 1.Plan RT scopes against the frontier us turnaround calendar to avoid rush premiums.
  • 2.Batch multiple assets at the same site (e.g. HF Sinclair Cheyenne Refinery) to amortise mobilisation across more billable hours.
  • 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
  • 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
  • 5.Where RT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
  • 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
Where RT is applied in Cheyenne
  • Pipeline girth welds per API 1104
  • Pressure vessel welds per ASME Section VIII
  • Casting volumetric inspection
Quick reference

Method

Radiographic Testing

Abbreviation

RT

Labour band

Tier 30.90)

Code authority

API 510 / 570 / 653

Get a quote

Post a RT scope and receive parallel quotes from certified Cheyenne providers.

Request a quote

Pricing caveat

The numbers above are field-anchored ranges, not a quote. Actual Cheyenne rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.