Skip to content
NDT Connect Logo
Home/Cost Guide/Tampa/Radiographic Testing
Pricing guide · Tier 1 labour band
Tampa, FL

NDT inspection cost in Tampa: Radiographic Testing rates

Field-anchored pricing guide for RT (Radiographic Testing) and the other five common NDT methods in Tampa, FL. Rates are quoted in USD per hour and reflect the Tier-1 labour band that applies across southeast markets.

Phosphate fertilizer plants run continuous-process operations — calibration intervals on PT and MT consumables compress under high-cycle workloads.

Low band

$472

per hour · routine scope, full-day crew

Typical

$826

per hour · most jobs land here

High band

$1416

per hour · turnaround / night shift / rope access

RT overview

Film or digital RT for new construction and in-service welds per ASME Section V and API 1104.

RT costs include source rental (Ir-192 or Co-60), film/DDA, processing, exclusion-zone setup, and radiation safety officer overhead. Night-shift premiums are common because exclusion zones can't coexist with other site work.

Why Tampa sits in the Tier-1 labour band

Tampa's industrial substrate — Phosphate, Power generation, Port operations — pulls NDT scopes onto recurring sites including Mosaic Fertilizer Tampa and Port Tampa Bay. The local contractor pool prices against NERC acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.

The Tier-1 multiplier (×1.18 applied to the national RT base band) accounts for local cost of living, procurement competition, and the documentary overhead that NERC imposes. RT programmes in Tampa have historically clustered around the typical rate of $826 per hour, with turnaround and outage premiums pushing toward the high band.

Recurring industries pricing against this band:

PhosphatePower generationPort operations

Named operators / sites: Mosaic Fertilizer Tampa, Port Tampa Bay.

Factors that move RT costs in Tampa

Crew rotation length

Multi-day mobilisations in Tampa amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.

Access and rigging

Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Phosphate sites in Tampa often require all three.

Shift premium

Night shift, weekend, and turnaround windows in Tampa typically carry a 25–40% premium on the base hourly rate.

Acceptance criteria

NERC acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.

Equipment specification

Source licensing, exclusion-zone management, and night-shift premiums are the primary cost levers.

Programme volume

Multi-asset programmes at sites like Mosaic Fertilizer Tampa typically negotiate volume discounts of 8–15% off the typical rate.

Mobilisation distance

Remote southeast sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Tampa).

Documentation depth

Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at NERC sites.

Procurement levers to get the best value
  • 1.Plan RT scopes against the southeast turnaround calendar to avoid rush premiums.
  • 2.Batch multiple assets at the same site (e.g. Mosaic Fertilizer Tampa) to amortise mobilisation across more billable hours.
  • 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
  • 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
  • 5.Where RT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
  • 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
Where RT is applied in Tampa
  • Pipeline girth welds per API 1104
  • Pressure vessel welds per ASME Section VIII
  • Casting volumetric inspection
Quick reference

Method

Radiographic Testing

Abbreviation

RT

Labour band

Tier 11.18)

Code authority

NERC

Get a quote

Post a RT scope and receive parallel quotes from certified Tampa providers.

Request a quote

Pricing caveat

The numbers above are field-anchored ranges, not a quote. Actual Tampa rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.