NDT inspection cost in Seattle: Ultrasonic Testing rates
Field-anchored pricing guide for UT (Ultrasonic Testing) and the other five common NDT methods in Seattle, WA. Rates are quoted in USD per hour and reflect the Tier-1 labour band that applies across pacific northwest markets.
Boeing's NAS 410 compliance requires up-to-date Level II/III certification visibility for every contractor inspector on every shift — a gap shuts the work centre down.
Low band
$266
per hour · routine scope, full-day crew
Typical
$502
per hour · most jobs land here
High band
$826
per hour · turnaround / night shift / rope access
Wall-thickness, weld and pressure-equipment inspection per ASME Section V and API 510/570/653.
Conventional UT (0.5–25 MHz contact or immersion) is the workhorse method on in-service pressure equipment. Costs scale with crew rotation length, instrument count, and access cost (rope access, scaffold, confined-space entry).
Seattle's industrial substrate — Aerospace (Boeing), Shipbuilding, Maritime — pulls NDT scopes onto recurring sites including Boeing Renton (737) and Boeing Everett (777, 767, 747). The local contractor pool prices against FAA Part 145 acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.
The Tier-1 multiplier (×1.18 applied to the national UT base band) accounts for local cost of living, procurement competition, and the documentary overhead that FAA Part 145 imposes. UT programmes in Seattle have historically clustered around the typical rate of $502 per hour, with turnaround and outage premiums pushing toward the high band.
Recurring industries pricing against this band:
Named operators / sites: Boeing Renton (737), Boeing Everett (777, 767, 747), Vigor Industrial Shipyard.
Crew rotation length
Multi-day mobilisations in Seattle amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.
Access and rigging
Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Aerospace (Boeing) sites in Seattle often require all three.
Shift premium
Night shift, weekend, and turnaround windows in Seattle typically carry a 25–40% premium on the base hourly rate.
Acceptance criteria
FAA Part 145 acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.
Equipment specification
Crew rotation and equipment count drive cost; couplant and consumables are negligible.
Programme volume
Multi-asset programmes at sites like Boeing Renton (737) typically negotiate volume discounts of 8–15% off the typical rate.
Mobilisation distance
Remote pacific northwest sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Seattle).
Documentation depth
Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at FAA Part 145 sites.
- 1.Plan UT scopes against the pacific northwest turnaround calendar to avoid rush premiums.
- 2.Batch multiple assets at the same site (e.g. Boeing Renton (737)) to amortise mobilisation across more billable hours.
- 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
- 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
- 5.Where UT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
- 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
- •Pipe and vessel wall-thickness surveys (API 570 / 510)
- •Weld inspection per ASME Section V
- •Storage tank shell and floor scanning (API 653)
Method
Ultrasonic Testing
Abbreviation
UT
Labour band
Tier 1 (×1.18)
Code authority
FAA Part 145
Get a quote
Post a UT scope and receive parallel quotes from certified Seattle providers.
Request a quotePricing caveat
The numbers above are field-anchored ranges, not a quote. Actual Seattle rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.
