Skip to content
NDT Connect Logo
Home/Cost Guide/Provo/Ultrasonic Testing
Pricing guide · Tier 3 labour band
Provo, UT

NDT inspection cost in Provo: Ultrasonic Testing rates

Field-anchored pricing guide for UT (Ultrasonic Testing) and the other five common NDT methods in Provo, UT. Rates are quoted in USD per hour and reflect the Tier-3 labour band that applies across mountain west markets.

Solid-rocket-motor work along the Wasatch Front demands NAS 410 Level II/III currency on every shift — a single lapsed cert stops a casing inspection cold.

Low band

$203

per hour · routine scope, full-day crew

Typical

$383

per hour · most jobs land here

High band

$630

per hour · turnaround / night shift / rope access

UT overview

Wall-thickness, weld and pressure-equipment inspection per ASME Section V and API 510/570/653.

Conventional UT (0.5–25 MHz contact or immersion) is the workhorse method on in-service pressure equipment. Costs scale with crew rotation length, instrument count, and access cost (rope access, scaffold, confined-space entry).

Why Provo sits in the Tier-3 labour band

Provo's industrial substrate — Steel, Composite manufacturing, Aerospace — pulls NDT scopes onto recurring sites including Geneva Works site (legacy steel) and Northrop Grumman Bacchus / Promontory (regional, solid rocket motors). The local contractor pool prices against ASME acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.

The Tier-3 multiplier (×0.90 applied to the national UT base band) accounts for local cost of living, procurement competition, and the documentary overhead that ASME imposes. UT programmes in Provo have historically clustered around the typical rate of $383 per hour, with turnaround and outage premiums pushing toward the high band.

Recurring industries pricing against this band:

SteelComposite manufacturingAerospace

Named operators / sites: Geneva Works site (legacy steel), Northrop Grumman Bacchus / Promontory (regional, solid rocket motors).

Factors that move UT costs in Provo

Crew rotation length

Multi-day mobilisations in Provo amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.

Access and rigging

Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Steel sites in Provo often require all three.

Shift premium

Night shift, weekend, and turnaround windows in Provo typically carry a 25–40% premium on the base hourly rate.

Acceptance criteria

ASME acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.

Equipment specification

Crew rotation and equipment count drive cost; couplant and consumables are negligible.

Programme volume

Multi-asset programmes at sites like Geneva Works site (legacy steel) typically negotiate volume discounts of 8–15% off the typical rate.

Mobilisation distance

Remote mountain west sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Provo).

Documentation depth

Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at ASME sites.

Procurement levers to get the best value
  • 1.Plan UT scopes against the mountain west turnaround calendar to avoid rush premiums.
  • 2.Batch multiple assets at the same site (e.g. Geneva Works site (legacy steel)) to amortise mobilisation across more billable hours.
  • 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
  • 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
  • 5.Where UT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
  • 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
Where UT is applied in Provo
  • Pipe and vessel wall-thickness surveys (API 570 / 510)
  • Weld inspection per ASME Section V
  • Storage tank shell and floor scanning (API 653)
Quick reference

Method

Ultrasonic Testing

Abbreviation

UT

Labour band

Tier 30.90)

Code authority

ASME

Get a quote

Post a UT scope and receive parallel quotes from certified Provo providers.

Request a quote

Pricing caveat

The numbers above are field-anchored ranges, not a quote. Actual Provo rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.