Skip to content
NDT Connect Logo
Home/Cost Guide/Portland/Phased Array Ultrasonic Testing
Pricing guide · Tier 1 labour band
Portland, OR

NDT inspection cost in Portland: Phased Array Ultrasonic Testing rates

Field-anchored pricing guide for PAUT (Phased Array Ultrasonic Testing) and the other five common NDT methods in Portland, OR. Rates are quoted in USD per hour and reflect the Tier-1 labour band that applies across pacific northwest markets.

Pacific Northwest aerospace composite inspection contractors have to keep level-of-effort visibility across small crews — losing a single Level II to an expired cert breaks a job.

Low band

$472

per hour · routine scope, full-day crew

Typical

$856

per hour · most jobs land here

High band

$1534

per hour · turnaround / night shift / rope access

PAUT overview

Encoded, imaged weld inspection per ISO 13588 and ASME Section V Mandatory Appendix.

PAUT carries a premium over conventional UT for equipment cost, procedure development, and Level II PAUT-credentialed technician availability. It often substitutes for RT — eliminating exclusion zones and night work — so on a per-weld basis it can come out cost-neutral or favourable.

Why Portland sits in the Tier-1 labour band

Portland's industrial substrate — Aerospace composites, Manufacturing, Steel — pulls NDT scopes onto recurring sites including Daimler Trucks North America and Boeing Portland. The local contractor pool prices against FAA Part 145 acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.

The Tier-1 multiplier (×1.18 applied to the national PAUT base band) accounts for local cost of living, procurement competition, and the documentary overhead that FAA Part 145 imposes. PAUT programmes in Portland have historically clustered around the typical rate of $856 per hour, with turnaround and outage premiums pushing toward the high band.

Recurring industries pricing against this band:

Aerospace compositesManufacturingSteel

Named operators / sites: Daimler Trucks North America, Boeing Portland.

Factors that move PAUT costs in Portland

Crew rotation length

Multi-day mobilisations in Portland amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.

Access and rigging

Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Aerospace composites sites in Portland often require all three.

Shift premium

Night shift, weekend, and turnaround windows in Portland typically carry a 25–40% premium on the base hourly rate.

Acceptance criteria

FAA Part 145 acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.

Equipment specification

Procedure development and PAUT-Level II tech availability drive cost. RT-substitution often nets cheaper at program level.

Programme volume

Multi-asset programmes at sites like Daimler Trucks North America typically negotiate volume discounts of 8–15% off the typical rate.

Mobilisation distance

Remote pacific northwest sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Portland).

Documentation depth

Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at FAA Part 145 sites.

Procurement levers to get the best value
  • 1.Plan PAUT scopes against the pacific northwest turnaround calendar to avoid rush premiums.
  • 2.Batch multiple assets at the same site (e.g. Daimler Trucks North America) to amortise mobilisation across more billable hours.
  • 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
  • 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
  • 5.Where PAUT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
  • 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
Where PAUT is applied in Portland
  • Code-case RT substitution on pipeline girth welds
  • Critical-weld inspection on heavy-wall vessels
  • Encoded corrosion mapping (C-scan)
Quick reference

Method

Phased Array Ultrasonic Testing

Abbreviation

PAUT

Labour band

Tier 11.18)

Code authority

FAA Part 145

Get a quote

Post a PAUT scope and receive parallel quotes from certified Portland providers.

Request a quote

Pricing caveat

The numbers above are field-anchored ranges, not a quote. Actual Portland rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.