NDT inspection cost in Everett: Magnetic Particle Testing rates
Field-anchored pricing guide for MT (Magnetic Particle Testing) and the other five common NDT methods in Everett, WA. Rates are quoted in USD per hour and reflect the Tier-1 labour band that applies across pacific northwest markets.
Composite inspection crews at Boeing Everett need real-time visibility on UT phased-array calibration status — a single uncalibrated instrument fails composite PA scans across an entire shift.
Low band
$207
per hour · routine scope, full-day crew
Typical
$384
per hour · most jobs land here
High band
$649
per hour · turnaround / night shift / rope access
Surface and near-surface crack detection on ferromagnetic welds per ASTM E709 / E1444.
MT is one of the lower-cost methods because equipment is portable, consumables are inexpensive, and a single technician can cover a structural-weld scope quickly. Costs trend up with fluorescent (wet-mag) work that requires darkroom conditions.
Everett's industrial substrate — Aerospace (Boeing 787, 777, 747), Composites inspection, Naval operations — pulls NDT scopes onto recurring sites including Boeing Everett Factory and Naval Station Everett. The local contractor pool prices against FAA Part 145 acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.
The Tier-1 multiplier (×1.18 applied to the national MT base band) accounts for local cost of living, procurement competition, and the documentary overhead that FAA Part 145 imposes. MT programmes in Everett have historically clustered around the typical rate of $384 per hour, with turnaround and outage premiums pushing toward the high band.
Recurring industries pricing against this band:
Named operators / sites: Boeing Everett Factory, Naval Station Everett.
Crew rotation length
Multi-day mobilisations in Everett amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.
Access and rigging
Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Aerospace (Boeing 787, 777, 747) sites in Everett often require all three.
Shift premium
Night shift, weekend, and turnaround windows in Everett typically carry a 25–40% premium on the base hourly rate.
Acceptance criteria
FAA Part 145 acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.
Equipment specification
Dry vs wet mag, AC vs DC yoke, and shift premium are the main cost differentiators.
Programme volume
Multi-asset programmes at sites like Boeing Everett Factory typically negotiate volume discounts of 8–15% off the typical rate.
Mobilisation distance
Remote pacific northwest sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Everett).
Documentation depth
Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at FAA Part 145 sites.
- 1.Plan MT scopes against the pacific northwest turnaround calendar to avoid rush premiums.
- 2.Batch multiple assets at the same site (e.g. Boeing Everett Factory) to amortise mobilisation across more billable hours.
- 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
- 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
- 5.Where MT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
- 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
- •AWS D1.1 weld surface examination
- •In-service fatigue-crack screening
- •Forging and casting surface inspection
Method
Magnetic Particle Testing
Abbreviation
MT
Labour band
Tier 1 (×1.18)
Code authority
FAA Part 145
Get a quote
Post a MT scope and receive parallel quotes from certified Everett providers.
Request a quotePricing caveat
The numbers above are field-anchored ranges, not a quote. Actual Everett rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.
