Skip to content
NDT Connect Logo
Home/Cost Guide/Cleveland/Radiographic Testing
Pricing guide · Tier 1 labour band
Cleveland, OH

NDT inspection cost in Cleveland: Radiographic Testing rates

Field-anchored pricing guide for RT (Radiographic Testing) and the other five common NDT methods in Cleveland, OH. Rates are quoted in USD per hour and reflect the Tier-1 labour band that applies across great lakes markets.

Steel-mill PT and MT cycles run continuously — calibration on consumables and reference materials has to be tracked daily, not weekly.

Low band

$472

per hour · routine scope, full-day crew

Typical

$826

per hour · most jobs land here

High band

$1416

per hour · turnaround / night shift / rope access

RT overview

Film or digital RT for new construction and in-service welds per ASME Section V and API 1104.

RT costs include source rental (Ir-192 or Co-60), film/DDA, processing, exclusion-zone setup, and radiation safety officer overhead. Night-shift premiums are common because exclusion zones can't coexist with other site work.

Why Cleveland sits in the Tier-1 labour band

Cleveland's industrial substrate — Steel, Heavy manufacturing, Power generation — pulls NDT scopes onto recurring sites including Cleveland-Cliffs Cleveland Works and FirstEnergy Davis-Besse (regional). The local contractor pool prices against ASME acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.

The Tier-1 multiplier (×1.18 applied to the national RT base band) accounts for local cost of living, procurement competition, and the documentary overhead that ASME imposes. RT programmes in Cleveland have historically clustered around the typical rate of $826 per hour, with turnaround and outage premiums pushing toward the high band.

Recurring industries pricing against this band:

SteelHeavy manufacturingPower generation

Named operators / sites: Cleveland-Cliffs Cleveland Works, FirstEnergy Davis-Besse (regional).

Factors that move RT costs in Cleveland

Crew rotation length

Multi-day mobilisations in Cleveland amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.

Access and rigging

Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Steel sites in Cleveland often require all three.

Shift premium

Night shift, weekend, and turnaround windows in Cleveland typically carry a 25–40% premium on the base hourly rate.

Acceptance criteria

ASME acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.

Equipment specification

Source licensing, exclusion-zone management, and night-shift premiums are the primary cost levers.

Programme volume

Multi-asset programmes at sites like Cleveland-Cliffs Cleveland Works typically negotiate volume discounts of 8–15% off the typical rate.

Mobilisation distance

Remote great lakes sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Cleveland).

Documentation depth

Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at ASME sites.

Procurement levers to get the best value
  • 1.Plan RT scopes against the great lakes turnaround calendar to avoid rush premiums.
  • 2.Batch multiple assets at the same site (e.g. Cleveland-Cliffs Cleveland Works) to amortise mobilisation across more billable hours.
  • 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
  • 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
  • 5.Where RT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
  • 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
Where RT is applied in Cleveland
  • Pipeline girth welds per API 1104
  • Pressure vessel welds per ASME Section VIII
  • Casting volumetric inspection
Quick reference

Method

Radiographic Testing

Abbreviation

RT

Labour band

Tier 11.18)

Code authority

ASME

Get a quote

Post a RT scope and receive parallel quotes from certified Cleveland providers.

Request a quote

Pricing caveat

The numbers above are field-anchored ranges, not a quote. Actual Cleveland rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.