NDT inspection cost in Cincinnati: Radiographic Testing rates
Field-anchored pricing guide for RT (Radiographic Testing) and the other five common NDT methods in Cincinnati, OH. Rates are quoted in USD per hour and reflect the Tier-2 labour band that applies across midwest markets.
Evendale assembles the world's most-flown commercial jet engine — a Level III FPI operator's expired Nadcap qual at first-piece can stop a $13M LEAP module before it leaves the bay.
Low band
$400
per hour · routine scope, full-day crew
Typical
$700
per hour · most jobs land here
High band
$1200
per hour · turnaround / night shift / rope access
Film or digital RT for new construction and in-service welds per ASME Section V and API 1104.
RT costs include source rental (Ir-192 or Co-60), film/DDA, processing, exclusion-zone setup, and radiation safety officer overhead. Night-shift premiums are common because exclusion zones can't coexist with other site work.
Cincinnati's industrial substrate — Aerospace engines (GE), Specialty chemicals, Power generation R&D — pulls NDT scopes onto recurring sites including GE Aerospace Evendale and GE Aerospace Peebles Test (regional). The local contractor pool prices against AS9100 acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.
The Tier-2 multiplier (×1.00 applied to the national RT base band) accounts for local cost of living, procurement competition, and the documentary overhead that AS9100 imposes. RT programmes in Cincinnati have historically clustered around the typical rate of $700 per hour, with turnaround and outage premiums pushing toward the high band.
Recurring industries pricing against this band:
Named operators / sites: GE Aerospace Evendale, GE Aerospace Peebles Test (regional), AK Steel Middletown Works (regional).
Crew rotation length
Multi-day mobilisations in Cincinnati amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.
Access and rigging
Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Aerospace engines (GE) sites in Cincinnati often require all three.
Shift premium
Night shift, weekend, and turnaround windows in Cincinnati typically carry a 25–40% premium on the base hourly rate.
Acceptance criteria
AS9100 acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.
Equipment specification
Source licensing, exclusion-zone management, and night-shift premiums are the primary cost levers.
Programme volume
Multi-asset programmes at sites like GE Aerospace Evendale typically negotiate volume discounts of 8–15% off the typical rate.
Mobilisation distance
Remote midwest sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Cincinnati).
Documentation depth
Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at AS9100 sites.
- 1.Plan RT scopes against the midwest turnaround calendar to avoid rush premiums.
- 2.Batch multiple assets at the same site (e.g. GE Aerospace Evendale) to amortise mobilisation across more billable hours.
- 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
- 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
- 5.Where RT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
- 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
- •Pipeline girth welds per API 1104
- •Pressure vessel welds per ASME Section VIII
- •Casting volumetric inspection
Method
Radiographic Testing
Abbreviation
RT
Labour band
Tier 2 (×1.00)
Code authority
AS9100
Get a quote
Post a RT scope and receive parallel quotes from certified Cincinnati providers.
Request a quotePricing caveat
The numbers above are field-anchored ranges, not a quote. Actual Cincinnati rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.
