Pricing guide · Tier 1 labour band
Billings, MT

NDT inspection cost in Billings: Ultrasonic Testing rates

Field-anchored pricing guide for UT (Ultrasonic Testing) and the other five common NDT methods in Billings, MT. Rates are quoted in USD per hour and reflect the Tier-1 labour band that applies across mountain west markets.

Northern-tier refinery turnarounds compete for limited NDT contractor capacity — losing a Level II to an expired cert removes a crew from rotation for weeks.

Low band

$266

per hour · routine scope, full-day crew

Typical

$502

per hour · most jobs land here

High band

$826

per hour · turnaround / night shift / rope access

UT overview

Wall-thickness, weld and pressure-equipment inspection per ASME Section V and API 510/570/653.

Conventional UT (0.5–25 MHz contact or immersion) is the workhorse method on in-service pressure equipment. Costs scale with crew rotation length, instrument count, and access cost (rope access, scaffold, confined-space entry).

Why Billings sits in the Tier-1 labour band

Billings's industrial substrate — Refining, Pipelines and midstream, Power generation — pulls NDT scopes onto recurring sites including ExxonMobil Billings Refinery and Phillips 66 Billings Refinery. The local contractor pool prices against API 510 / 570 acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.

The Tier-1 multiplier (×1.18 applied to the national UT base band) accounts for local cost of living, procurement competition, and the documentary overhead that API 510 / 570 imposes. UT programmes in Billings have historically clustered around the typical rate of $502 per hour, with turnaround and outage premiums pushing toward the high band.

Recurring industries pricing against this band:

RefiningPipelines and midstreamPower generation

Named operators / sites: ExxonMobil Billings Refinery, Phillips 66 Billings Refinery.

Factors that move UT costs in Billings

Crew rotation length

Multi-day mobilisations in Billings amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.

Access and rigging

Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Refining sites in Billings often require all three.

Shift premium

Night shift, weekend, and turnaround windows in Billings typically carry a 25–40% premium on the base hourly rate.

Acceptance criteria

API 510 / 570 acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.

Equipment specification

Crew rotation and equipment count drive cost; couplant and consumables are negligible.

Programme volume

Multi-asset programmes at sites like ExxonMobil Billings Refinery typically negotiate volume discounts of 8–15% off the typical rate.

Mobilisation distance

Remote mountain west sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Billings).

Documentation depth

Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at API 510 / 570 sites.

Procurement levers to get the best value
  • 1.Plan UT scopes against the mountain west turnaround calendar to avoid rush premiums.
  • 2.Batch multiple assets at the same site (e.g. ExxonMobil Billings Refinery) to amortise mobilisation across more billable hours.
  • 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
  • 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
  • 5.Where UT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
  • 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
Where UT is applied in Billings
  • Pipe and vessel wall-thickness surveys (API 570 / 510)
  • Weld inspection per ASME Section V
  • Storage tank shell and floor scanning (API 653)
Quick reference

Method

Ultrasonic Testing

Abbreviation

UT

Labour band

Tier 11.18)

Code authority

API 510 / 570

Get a quote

Post a UT scope and receive parallel quotes from certified Billings providers.

Request a quote

Pricing caveat

The numbers above are field-anchored ranges, not a quote. Actual Billings rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.