NDT inspection cost in Billings: Radiographic Testing rates
Field-anchored pricing guide for RT (Radiographic Testing) and the other five common NDT methods in Billings, MT. Rates are quoted in USD per hour and reflect the Tier-1 labour band that applies across mountain west markets.
Northern-tier refinery turnarounds compete for limited NDT contractor capacity — losing a Level II to an expired cert removes a crew from rotation for weeks.
Low band
$472
per hour · routine scope, full-day crew
Typical
$826
per hour · most jobs land here
High band
$1416
per hour · turnaround / night shift / rope access
Film or digital RT for new construction and in-service welds per ASME Section V and API 1104.
RT costs include source rental (Ir-192 or Co-60), film/DDA, processing, exclusion-zone setup, and radiation safety officer overhead. Night-shift premiums are common because exclusion zones can't coexist with other site work.
Billings's industrial substrate — Refining, Pipelines and midstream, Power generation — pulls NDT scopes onto recurring sites including ExxonMobil Billings Refinery and Phillips 66 Billings Refinery. The local contractor pool prices against API 510 / 570 acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.
The Tier-1 multiplier (×1.18 applied to the national RT base band) accounts for local cost of living, procurement competition, and the documentary overhead that API 510 / 570 imposes. RT programmes in Billings have historically clustered around the typical rate of $826 per hour, with turnaround and outage premiums pushing toward the high band.
Recurring industries pricing against this band:
Named operators / sites: ExxonMobil Billings Refinery, Phillips 66 Billings Refinery.
Crew rotation length
Multi-day mobilisations in Billings amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.
Access and rigging
Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Refining sites in Billings often require all three.
Shift premium
Night shift, weekend, and turnaround windows in Billings typically carry a 25–40% premium on the base hourly rate.
Acceptance criteria
API 510 / 570 acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.
Equipment specification
Source licensing, exclusion-zone management, and night-shift premiums are the primary cost levers.
Programme volume
Multi-asset programmes at sites like ExxonMobil Billings Refinery typically negotiate volume discounts of 8–15% off the typical rate.
Mobilisation distance
Remote mountain west sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Billings).
Documentation depth
Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at API 510 / 570 sites.
- 1.Plan RT scopes against the mountain west turnaround calendar to avoid rush premiums.
- 2.Batch multiple assets at the same site (e.g. ExxonMobil Billings Refinery) to amortise mobilisation across more billable hours.
- 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
- 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
- 5.Where RT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
- 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
- •Pipeline girth welds per API 1104
- •Pressure vessel welds per ASME Section VIII
- •Casting volumetric inspection
Method
Radiographic Testing
Abbreviation
RT
Labour band
Tier 1 (×1.18)
Code authority
API 510 / 570
Get a quote
Post a RT scope and receive parallel quotes from certified Billings providers.
Request a quotePricing caveat
The numbers above are field-anchored ranges, not a quote. Actual Billings rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.