NDT inspection cost in Stavanger: Radiographic Testing rates

Field-anchored pricing guide for RT (Radiographic Testing) and the other five common NDT methods in Stavanger, NO. Rates are quoted in USD per hour and reflect the Tier-4 labour band that applies across northeast markets.

PSA Norway audits NDT records at the asset and corporate level simultaneously — Equinor and partner contractors run NORSOK-grade traceability where a cal-record gap reads as a safety-case deficiency.

Low band

$340

per hour · routine scope, full-day crew

Typical

$595

per hour · most jobs land here

High band

$1020

per hour · turnaround / night shift / rope access

RT overview

Film or digital RT for new construction and in-service welds per ASME Section V and API 1104.

RT costs include source rental (Ir-192 or Co-60), film/DDA, processing, exclusion-zone setup, and radiation safety officer overhead. Night-shift premiums are common because exclusion zones can't coexist with other site work.

Why Stavanger sits in the Tier-4 labour band

Stavanger's industrial substrate — North Sea offshore oil and gas, Subsea, Floating production — pulls NDT scopes onto recurring sites including Equinor Forus HQ and Aker Solutions Stavanger. The local contractor pool prices against PSA Norway (Petroleumstilsynet) acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.

The Tier-4 multiplier (×0.85 applied to the national RT base band) accounts for local cost of living, procurement competition, and the documentary overhead that PSA Norway (Petroleumstilsynet) imposes. RT programmes in Stavanger have historically clustered around the typical rate of $595 per hour, with turnaround and outage premiums pushing toward the high band.

Recurring industries pricing against this band:

North Sea offshore oil and gasSubseaFloating production

Named operators / sites: Equinor Forus HQ, Aker Solutions Stavanger, Aker BP Stavanger.

Factors that move RT costs in Stavanger

Crew rotation length

Multi-day mobilisations in Stavanger amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.

Access and rigging

Rope access, scaffold, or confined-space entry add 15–35% to the base rate. North Sea offshore oil and gas sites in Stavanger often require all three.

Shift premium

Night shift, weekend, and turnaround windows in Stavanger typically carry a 25–40% premium on the base hourly rate.

Acceptance criteria

PSA Norway (Petroleumstilsynet) acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.

Equipment specification

Source licensing, exclusion-zone management, and night-shift premiums are the primary cost levers.

Programme volume

Multi-asset programmes at sites like Equinor Forus HQ typically negotiate volume discounts of 8–15% off the typical rate.

Mobilisation distance

Remote northeast sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Stavanger).

Documentation depth

Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at PSA Norway (Petroleumstilsynet) sites.

Procurement levers to get the best value
  • 1.Plan RT scopes against the northeast turnaround calendar to avoid rush premiums.
  • 2.Batch multiple assets at the same site (e.g. Equinor Forus HQ) to amortise mobilisation across more billable hours.
  • 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
  • 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
  • 5.Where RT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
  • 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
Where RT is applied in Stavanger
  • Pipeline girth welds per API 1104
  • Pressure vessel welds per ASME Section VIII
  • Casting volumetric inspection
Quick reference

Method

Radiographic Testing

Abbreviation

RT

Labour band

Tier 40.85)

Code authority

PSA Norway (Petroleumstilsynet)

Get a quote

Post a RT scope and receive parallel quotes from certified Stavanger providers.

Request a quote

Pricing caveat

The numbers above are field-anchored ranges, not a quote. Actual Stavanger rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.