NDT inspection cost in Macaé: Ultrasonic Testing rates
Field-anchored pricing guide for UT (Ultrasonic Testing) and the other five common NDT methods in Macaé, BR. Rates are quoted in USD per hour and reflect the Tier-4 labour band that applies across southeast markets.
Macaé is the staging base for the Campos basin — calibrated NDT kits move offshore on tight chopper schedules, and a missed cal cycle on a UT thickness gauge strands a Level II two days from his lab.
Low band
$191
per hour · routine scope, full-day crew
Typical
$361
per hour · most jobs land here
High band
$595
per hour · turnaround / night shift / rope access
Wall-thickness, weld and pressure-equipment inspection per ASME Section V and API 510/570/653.
Conventional UT (0.5–25 MHz contact or immersion) is the workhorse method on in-service pressure equipment. Costs scale with crew rotation length, instrument count, and access cost (rope access, scaffold, confined-space entry).
Macaé's industrial substrate — Offshore services hub (Campos / Santos basin), Subsea, Helicopter logistics — pulls NDT scopes onto recurring sites including Petrobras UO-BC (Bacia de Campos operations base) Macaé and Macaé heliport (offshore logistics hub). The local contractor pool prices against ANP acceptance criteria, which requires Level II / III certified personnel and traceable instrument calibration. That floor — not raw wage data — is what sets the band.
The Tier-4 multiplier (×0.85 applied to the national UT base band) accounts for local cost of living, procurement competition, and the documentary overhead that ANP imposes. UT programmes in Macaé have historically clustered around the typical rate of $361 per hour, with turnaround and outage premiums pushing toward the high band.
Recurring industries pricing against this band:
Named operators / sites: Petrobras UO-BC (Bacia de Campos operations base) Macaé, Macaé heliport (offshore logistics hub).
Crew rotation length
Multi-day mobilisations in Macaé amortise travel and per-diem across more billable hours, lowering the per-hour rate. Single-day call-outs sit at the high band.
Access and rigging
Rope access, scaffold, or confined-space entry add 15–35% to the base rate. Offshore services hub (Campos / Santos basin) sites in Macaé often require all three.
Shift premium
Night shift, weekend, and turnaround windows in Macaé typically carry a 25–40% premium on the base hourly rate.
Acceptance criteria
ANP acceptance criteria require Level II / III sign-off, which prices above structural-weld AWS D1.1 work.
Equipment specification
Crew rotation and equipment count drive cost; couplant and consumables are negligible.
Programme volume
Multi-asset programmes at sites like Petrobras UO-BC (Bacia de Campos operations base) Macaé typically negotiate volume discounts of 8–15% off the typical rate.
Mobilisation distance
Remote southeast sites add a per-trip mobilisation charge ($350–$1,500 depending on travel distance from Macaé).
Documentation depth
Full digital scan packages with audit-grade traceability cost 10–20% more than basic written report deliverables, and are required at ANP sites.
- 1.Plan UT scopes against the southeast turnaround calendar to avoid rush premiums.
- 2.Batch multiple assets at the same site (e.g. Petrobras UO-BC (Bacia de Campos operations base) Macaé) to amortise mobilisation across more billable hours.
- 3.Provide detailed component specs and accessibility info up-front — vague RFPs price high to absorb uncertainty.
- 4.Standardise on a single contractor for programme work; spot-buys carry a 10–20% premium.
- 5.Where UT is interchangeable with another method (RT ↔ PAUT, MT ↔ PT), price both before committing.
- 6.Verify Level II / III currency before quote — re-mobilisation for an expired cert is unbillable to the asset.
- •Pipe and vessel wall-thickness surveys (API 570 / 510)
- •Weld inspection per ASME Section V
- •Storage tank shell and floor scanning (API 653)
Method
Ultrasonic Testing
Abbreviation
UT
Labour band
Tier 4 (×0.85)
Code authority
ANP
Get a quote
Post a UT scope and receive parallel quotes from certified Macaé providers.
Request a quotePricing caveat
The numbers above are field-anchored ranges, not a quote. Actual Macaé rates vary with scope, accessibility, shift, and contractor utilisation. Always solicit at least three quotes before committing programme spend.